Saturday, July 2, 2011
The Navy has received its first P-8A production representative operational test aircraft
NAVAL AIR SYSTEMS COMMAND PATUXENT RIVER, Md. – The Navy has received its first P-8A production representative operational test aircraft June 24.
The new P-8A arrived at NAS Patuxent River and it will join three developmental test aircraft already undergoing integrated testing in preparation for initial operational test and evaluation of the P-8A Poseidon.
The Navy entered into Low Rate Initial Production of the first six Poseidon aircraft in January 2011. These aircraft will be used to form the first operational P-8A squadron, which is scheduled for initial operational capability in 2013.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment